Join us on Facebook!
Click on a thumbnail below to view a full size photo. Use arrows to scroll right and left.
The following are examples of pipe runs fabricated by MWI students.
Pipe Laboratory Entryway
4” Header with 2” branch connections (simulating boiler tubes)
3” and 4” pipe connections into a 12” vessel
Rolling Offset
Miter Turn Offset with 45 deg. Rise and 45 deg. Turn
Instructor covers a piping “iso” with MWI students before they start fabricating their pipe run
Student hand beveling a piece of 4” pipe
Student checking to see if his pipe end preparation is square
Students working together as welder and fitter
Instructor demonstrating proper body positioning and welding technique while tacking in position
- Photo 13
Student leveling a fitting to pipe
Tacking a fitting “In Position”
Offsetting a 90 deg. Fitting to a 45 deg. Angle
Squaring a Flange to the Pipe
Director of Training Jim Paarmann watches over his students as they complete a pipe run
Students preparing to hang their pipe run
Student making the top tack on a flange
A fine group of MWI students about to graduate and go to work in field construction